1. Business Requirement
- AISS 2025 required a high-availability, dynamically reconfigurable network infrastructure to support varying user loads and functional zones across three consecutive event days. The scope included:
- Hackathon connectivity with wired and wireless access
- High-density Wi-Fi across multiple halls and floors
- Dynamic teardown and reconfiguration between event days
- Guaranteed uptime for long operational hours
2. Key Design Challenges
- Dynamic Day-wise Network Requirements: Infrastructure needed to be dismantled and reconfigured overnight without impacting event continuity.
- High Concurrent User Load: Supporting up to 500+ users simultaneously across multiple floors and halls.
- Hackathon Environment: Day 1 required low-latency ethernet drops and Wi-Fi for intensive computing workloads.
- Exhibitor Connectivity: Day 2 and Day 3 required stable Wi-Fi for 200 exhibitor users, while maintaining attendee and operations connectivity.
- Extended Event Hours: Continuous network reliability from 7:00 AM to 9:00 PM daily with zero downtime tolerance.
3. Day-wise Network Design & Execution
Day 1 – Hackathon & Conference Operations
Courtyard Area:
- Connectivity for 350 hackathon participants
- Combination of ethernet drops and high-density Wi-Fi for performance-critical usage
Lower Ground Floor & Upper Ground Floor:
- Wi-Fi coverage across multiple halls
- Support for approximately 500 concurrent users, including attendees, speakers, and organizers
- Dedicated bandwidth allocation and traffic management ensured optimal performance for compute-heavy hackathon activities.
Day 2 – Exhibitor & Conference Operations
Courtyard Reconfiguration:
- Complete removal of Day 1 hackathon setup post-event
- Area converted into a Wi-Fi zone for 200 exhibitor users
Lower Ground Floor & Upper Ground Floor:
- Conference Wi-Fi requirements remained unchanged
- Stable connectivity maintained across all halls and operational zones
- Network reconfiguration was executed during non-event hours to ensure seamless Day 2 readiness.
Day 3 – Continuation of Exhibitor & Conference Setup
- Same network architecture as Day 2
- Continuous Wi-Fi support for exhibitors, attendees, and operations
- Proactive monitoring ensured consistent performance throughout the day











Yash Infosystems - Pullman Aerocity, New Delhi :
4. Network Architecture & Design
Internet Bandwidth:
- 1 Gbps (1:1) dedicated symmetric internet on fiber
- 500 Mbps alternate ISP backup for redundancy
Core Network:
- Dual WAN architecture with load handling and failover
- Layer 3 core switching for efficient routing and traffic segmentation
Access Layer:
- Enterprise-grade wireless access points for high-density coverage
- Ethernet drops provisioned for hackathon and backend systems
Monitoring & Support:
- Continuous real-time monitoring
- On-site L1–L3 network engineers throughout event hours
5. Implementation & Operations
- Rapid installation and configuration aligned with venue constraints
- Overnight teardown and re-deployment between Day 1 and Day 2
- Continuous performance monitoring during live hours (7 AM – 9 PM)
- Immediate fault isolation and resolution capability
6. Outcome & Results
- 100% uptime across all three event days
- Seamless support for hackathon, exhibitor, and conference use cases
- Successful overnight reconfiguration without service impact
- Stable, high-performance connectivity for over 500 concurrent users
- Delivered a flexible, scalable, and resilient event network architecture
7. Value Delivered
- Demonstrated expertise in dynamic event network design
- Proven capability to handle complex, multi-day reconfiguration
- High-availability architecture aligned with enterprise expectations
- Reliable execution under extended operational hours